NCA-Registered Contractor · Nairobi, Kenya · Est. 2011

We build the structure. We finish the story.

Based in Nairobi and building across East Africa, Infinity Pro Construction & Interior handles the full span of a project — foundations, framing, and permits on one side, cabinetry, lighting, and finishes on the other — under a single contract, held to a global standard of craft.

Projects delivered340+
Years in operation13
Avg. build-to-handover11 weeks
Warranty on workmanship5 yr
01 — Structure

Construction & Renovation

Ground-up builds, additions, and structural renovations — engineered, permitted, and built to code.

  • A New builds & additions
  • B Structural renovation
  • C Foundations, framing, roofing
  • D Permits & code compliance
02 — Interior

Design & Fit-Out

Once the shell is sound, we bring in the material, light, and detail that make a space feel finished.

  • A Interior design & space planning
  • B Custom cabinetry & millwork
  • C Flooring, lighting, finishes
  • D Furnishing & styling
What we do

Four disciplines, one contract

01

General Construction

New builds, additions, and full structural renovations from permit to final inspection.

02

Renovation & Remodeling

Kitchen, bath, and whole-home remodels that reconfigure a space without starting from zero.

03

Interior Design & Fit-Out

Space planning, materials, custom millwork, and lighting that carry a project to move-in ready.

04

Project Management

One point of contact for scheduling, subcontractors, budget, and inspections start to finish.

How a project runs

From first sketch to final walkthrough

01

Consultation & Design

We walk the site, understand how you'll use the space, and develop drawings and a material palette together.

Week 1–2
02

Planning & Permits

Engineering, permit filing, and final pricing are locked before a single wall comes down.

Week 2–4
03

Construction

Structural work — foundations, framing, systems — carried out by our in-house crews, inspected at every stage.

Week 4–8
04

Interior Finishing

Flooring, cabinetry, lighting, paint, and fixtures go in, matched to the design plan from day one.

Week 8–10
05

Handover & Aftercare

Final walkthrough, documentation, and a 5-year workmanship warranty on everything we build.

Week 11
See it before you commit to it

What a full renovation actually changes

Before and after comparison of a modern villa renovation
Concept reference

Same footprint. Completely different building.

Drag any panel below to see how a raw concrete shell becomes a finished, livable home once structure and interior finishing happen under one plan instead of two separate contractors.

Before renovation
After renovation
Before After
Before renovation
After renovation
Before After
Before renovation
After renovation
Before After
Before renovation
After renovation
Before After
Before renovation
After renovation
Before After
Before renovation
After renovation
Before After

340+

Projects completed

13

Years in business

98%

Client satisfaction

5 yr

Workmanship warranty

From the team

Insights & project notes

How to Budget for a Full Home Renovation

A realistic breakdown of where the money actually goes — structure, permits, finishes, and the contingency most homeowners forget to plan for.

Read the guide →

Structural vs Cosmetic Renovation: What's the Difference

Not every remodel needs an engineer. Here's how to tell which category your project falls into before you get a quote.

Read the guide →

5 Questions to Ask Before Hiring a General Contractor

Licensing, insurance, payment schedules, and the one question most people forget until it's too late.

Read the guide →
How to Budget for a Full Home Renovation+
Budgeting · Jul 2, 2026 · 6 min read

Most renovation budgets in Nairobi don't fail because the number was too small. They fail because the number only ever covered one part of the job — usually the visible part, like tiles and paint — while the expensive, invisible part got guessed at or ignored entirely.

Split the budget into two, not one

Treat "structure" and "interior" as two separate budgets that happen to share a schedule. Structural work — foundations, walls, roofing, plumbing and electrical re-routing, waterproofing — is priced by the square metre and driven by the condition of what's already there. Interior work — flooring, cabinetry, fittings, lighting, paint — is priced by finish level, and this is where costs swing the most. A kitchen can be finished in laminate or in imported stone for the same footprint at very different totals, and both are legitimate choices depending on the brief.

Get a real Bill of Quantities before you commit

A one-page estimate is not a budget. Ask any contractor you're considering for a proper Bill of Quantities (BOQ) that breaks the project into line items — materials, labour, and a rate for each. This is the single biggest thing that separates a predictable build from one that doubles in cost halfway through. If a contractor won't give you a BOQ before asking for a deposit, treat that as a warning sign, not a shortcut.

Budget for what you can't see yet

Older Nairobi homes in particular tend to hide surprises behind walls and under floors — outdated wiring, corroded plumbing, or foundations that need reinforcement once opened up. A contingency of 10–15% on top of the BOQ total is standard practice, not a padded number. Projects that skip this line are usually the ones that stall for weeks waiting on an unplanned change order.

Tie payments to milestones, not dates

A sound payment schedule follows physical progress — foundation complete, structure to roof level, first fix (plumbing/electrical), second fix and finishes, handover — rather than the calendar. This protects both sides: you're not paying for work that hasn't happened, and the contractor isn't financing your project out of pocket.

Don't forget permit and professional fees

County approvals, NCA registration checks, and structural engineer sign-off for anything load-bearing are real costs that belong in the budget from day one, not added as a surprise once drawings are ready. For most residential renovations in Nairobi County, budgeting 3–6% of construction cost for permits, approvals, and professional fees is a reasonable starting point — your contractor should be able to confirm current rates for your specific project.

General guidance only — permit fees, timelines, and approval requirements vary by county and project. Always confirm current costs with your contractor and the relevant county offices before finalizing a budget.
Structural vs Cosmetic Renovation: What's the Difference+
Renovation · Jul 18, 2026 · 5 min read

Every renovation conversation eventually runs into the same question: does this need an engineer, or just a good finishing crew? Getting the answer wrong in either direction either wastes money on unnecessary approvals, or — far more seriously — puts a structural change into a home without the checks it needed.

Cosmetic renovation: changing how a space looks

Cosmetic work changes finishes without touching the building's structure: repainting, re-tiling, replacing kitchen or bathroom fittings, new flooring, updated lighting, built-in cabinetry that doesn't bear load. This category generally doesn't require county approval or an engineer, though electrical and plumbing work should still be handled by a qualified tradesperson.

Structural renovation: changing what holds the building up

Structural work changes the building's load path: removing or altering a load-bearing wall, adding a second storey, extending the footprint, altering the roof structure, or working near foundations. This category requires a structural engineer's assessment, drawings, and — in almost every case — county approval before work starts. Skipping this step isn't just a compliance risk; it's a genuine safety risk to everyone who uses the building afterward.

Why soil and site conditions matter here

Parts of Nairobi and the wider region sit on expansive or black cotton soils that shift with moisture, which makes foundation work and any load-bearing alteration more sensitive to get wrong than in many other markets. A proper site and soil assessment before structural work isn't a formality — it's the difference between a wall that lasts decades and one that cracks within a season.

How to tell which one you're planning

  • Are you removing, moving, or cutting into any wall that carries weight from above? → Structural.
  • Are you adding floor area, a room, or a storey? → Structural.
  • Are you changing only surfaces — paint, tiles, fittings, cabinetry — without touching walls or the roof line? → Cosmetic.
  • Not sure? Get a site visit before you get a quote. A five-minute assessment is far cheaper than an assumption that turns out wrong.

Most renovations are actually a mix of both, which is exactly why we scope every project with a structural assessment first — it sets the real budget and timeline before any finish decisions are made.

This is general information, not engineering advice. Any load-bearing or structural change should be assessed by a qualified structural engineer and approved through your local county authority before work begins.
5 Questions to Ask Before Hiring a General Contractor+
Hiring a Contractor · Aug 5, 2026 · 4 min read

The construction sector has no shortage of people willing to take a deposit and start digging. It has a much smaller pool of contractors who can actually finish what they start, on the budget they quoted. These five questions separate the two, and any contractor worth hiring should answer all of them without hesitating.

1. Are you registered with the National Construction Authority, and at what class?

Kenya's NCA classifies contractors by the scale of project they're licensed to handle. Ask for the registration number and verify it — a legitimate contractor will have no problem sharing this, because it's public information.

2. Can I see proof of insurance and liability cover?

Site accidents and property damage happen even on well-run projects. Insurance protects you as the client from being financially exposed if something goes wrong on your property during construction.

3. Will I get a full Bill of Quantities, not just a total price?

A single lump-sum number with no breakdown makes it impossible to know what you're actually paying for, or to compare quotes fairly between contractors. A proper BOQ, with material and labour rates itemized, is standard practice for any serious contractor.

4. Who is on-site day to day, and how is subcontractor work supervised?

Find out whether the person who sold you the project is the person managing it, and how often specialist subcontractors (electrical, plumbing, structural) are inspected before their work gets closed up behind walls and floors.

5. What happens after handover if something fails?

Ask specifically about the workmanship warranty period and what it covers. A contractor confident in their work will offer this without being asked twice — and will put it in writing.

If a contractor can answer all five clearly and in writing, you're talking to a professional operation. If any answer is vague, that vagueness tends to show up again later — usually at the worst possible point in the project.

General guidance for prospective clients. Always verify registration and insurance details directly with the relevant authorities before signing a contract.

Want new posts sent to you?

One email a month — project breakdowns, budgeting tips, and before/afters. No spam.

Get in touch
Client feedback

What people say after we hand over the keys

"They handled the structural work and the interior finish as one team, so nothing got lost between contractors. The house was ready two weeks ahead of schedule."

W. NjorogeKaren Villa Renovation

"We had a fixed budget and a hard deadline for our office move. Infinity Pro gave us a real schedule and kept to it, week by week."

A. MbekiWestlands Office Fit-Out

"We managed the build from London and never once felt out of the loop. Site photos every Friday, a BOQ we could actually follow, and a finish that matches anything we've built in Europe."

C. WhitfieldDiaspora client, Runda New Build
Start a project

Tell us what you're building.

Send us a few details and we'll follow up within one business day with next steps and a rough timeline.

OfficeKaren Road, off Ngong Road, Nairobi, Kenya
HoursMon–Fri, 8:00–18:00
Please enter your name.
Please enter a phone number.
Please enter a valid email.
Please select a project type.
Please add a few details.
Opening your email app with this request prefilled — hit send there to reach us. If nothing opens, email hello@infinityproci.com or call +254 758 686 690 directly.
WhatsApp